New wireless access points will be installed at all campuses and buildings during the summer of 2022. Wireless connections will not be available at the locations on the date of the installation. INstallations are 1 - 2 days per campus.
See installation schedule below:
Meraki Access Point Installation Schedule
Comments
0 comments
Please sign in to leave a comment.